Compound 90° around a round obstruction
A compound 90 turns a corner with two 45° bends instead of one 90, cutting across the corner in front of something that sits in it. This screen is for a round obstruction, such as a pipe or tank touching both walls.
What to measure
- Stub length: from the end of the conduit to the back of the other leg, as for a 90.
- Obstruction diameter: across the round obstruction, which is taken to sit in the corner touching both walls.
- Other leg (optional): from the other end to the back of the stub. With it you get the Cut length.
- First bend or Between bends (optional): when the first bend has to go somewhere in particular, or the chamfer has to be a set length, type it in and the other follows. Clearance then shows whether the conduit still clears the obstruction; leave the obstruction blank if there isn’t one.
How to bend it
- Mark the First mark from the stub end, and the second mark Between bends further along.
- Put the first mark on the arrow with the hook facing the stub end, and bend 45°.
- Slide to the second mark and bend another 45° the same way, with the hook still facing the stub end, so the two make 90°.
- Check that the stub and leg are square to each other and both bends are in one plane.
Where the numbers come from
The two 45s are joined by a straight chamfer that passes just outside the obstruction. For a circle touching both walls, the chamfer’s length from corner to corner (where the straight lines would meet) is 2.4 × the diameter. The rest is the same radius math as any other bend.
chamfer = 2.4 × diameterbetween bends = chamfer − g(45°)first mark = stub − OD/2 − chamfer ÷ √2 − setback(45°) − start of bend- Stub length
- 36"
- Obstruction diameter
- 12"
- Other leg
- 36"
- First mark
- 13 1/16" (15 5/8" by multiplier)
- Between bends
- 28 5/8" (28 13/16" by multiplier)
- Cut length
- 59"
The chamfer doesn’t allow for the conduit’s own size, but because the stub, leg and obstruction are all measured to the walls, the conduit still clears by about a fifth of its OD. The 2.4 is rounded down from 2.414, which eats into that: with 1/2" EMT the gap is about 1/16" on a 12" obstruction and gone on a 24" one. Clearance shows the gap, and the bend turns orange if the conduit would touch. Adding about 1% to the diameter you enter opens it up again.
If it turns orange or red
Red means the stub or the leg is too short for the chamfer, so a bend would run off the end of the conduit. Orange or red can also mean the two 45s are too close together for the shoe, which only happens with a very small obstruction. Orange also shows when the conduit would touch the obstruction (a negative Clearance), or when the cut length is longer than one stick.